I work in the fast growing Data,Voice and wireless industry. I work with the Detroit Public Schools I have a new wireless install with in a school. The installation contractor is installing all of the access points above the drop ceiling.
In our new construction areas we are using the american access technology fire proof closures.
The have a dome shape and drop into the tee bar perfectly in a 2x2 profile who is right here in any air plenium I was told to never ever install electronics as per BICSI requirements.
What Nec code can I referance.
I could really use your help on this one and also something to give me backing.
Thank you and all the best Brian
Brian.flynn@detroitk12.org
In our new construction areas we are using the american access technology fire proof closures.
The have a dome shape and drop into the tee bar perfectly in a 2x2 profile who is right here in any air plenium I was told to never ever install electronics as per BICSI requirements.
What Nec code can I referance.
I could really use your help on this one and also something to give me backing.
Thank you and all the best Brian
Brian.flynn@detroitk12.org