A Alwayslearningelec Senior Member Location NJ Occupation Estimator Friday at 9:46 PM #1 I see NAVD is the north american vertical datum. I'm trying to covert or find this number 13 or 14 and corrosion it to an elevation AFF( above finished floor).
I see NAVD is the north american vertical datum. I'm trying to covert or find this number 13 or 14 and corrosion it to an elevation AFF( above finished floor).
A Alwayslearningelec Senior Member Location NJ Occupation Estimator Friday at 9:58 PM #2 I did come across this. I'm just trying to determine at what height it the DFE as we can use MC cable above that.
I did come across this. I'm just trying to determine at what height it the DFE as we can use MC cable above that.