Looking at a 4 story Medical Office Building to be located in Brooklyn. Will the elevator need to have Legally Required generator backup? And what is the applicable rule?
New York City Building Code refers to NEC Article 701 loads as Standby Power. You need to know what occupancy group the building is and if it is part of the Architects egress path.