Elevator shaft and power

Status
Not open for further replies.

Tainted

Senior Member
Location
New York
Occupation
Engineer (PE)
The building is upgrading their elevator. The new feeders providing power will need to go to the roof small enclosure where the elevator controller is. Is it okay to run elevator power feeder in the existing elevator shaft?

Does NEC 620.37 permit this?
 