I have a question regarding feeding a new construction building out of our existing HQ gear.
Currently the generator switch gear is fed from a 2500A generator located in the CUP. The feeders come in to the switch gear and into a center mounted 2500A main breaker. This then feeds an attached switch location adjacent to the left and right with a shared bus. To the left is the 700 series emergency lighting and to the right feeds the elevators and data center switch gear.
We are looking at feeding the new conference center out of our standard building feed to a new ATS which is also fed from the generator switch gear described above. We are being told by the gear guys that we cannot feed the new conference center ATS out of the right side of the generator gear where we have the space because the conference center backup will contain the emergency lighting?
So the question is - Why would it matter from a design standpoint if we fed the conference center out of the right side of the generator switch gear? My thoughts are it is already set up for emergency back up duty and shares a bus with the other two non emergency breakers anyway?
Thank you for any replies. I just want to be prepared when we sit down for a meeting with the gear guys, inspector and our design engineers.
I have a question regarding feeding a new construction building out of our existing HQ gear.
Currently the generator switch gear is fed from a 2500A generator located in the CUP. The feeders come in to the switch gear and into a center mounted 2500A main breaker. This then feeds an attached switch location adjacent to the left and right with a shared bus. To the left is the 700 series emergency lighting and to the right feeds the elevators and data center switch gear.
We are looking at feeding the new conference center out of our standard building feed to a new ATS which is also fed from the generator switch gear described above. We are being told by the gear guys that we cannot feed the new conference center ATS out of the right side of the generator gear where we have the space because the conference center backup will contain the emergency lighting?
So the question is - Why would it matter from a design standpoint if we fed the conference center out of the right side of the generator switch gear? My thoughts are it is already set up for emergency back up duty and shares a bus with the other two non emergency breakers anyway?
Thank you for any replies. I just want to be prepared when we sit down for a meeting with the gear guys, inspector and our design engineers.