Hi. NJ has just adopted 2020 NEC and I’ve yet to get a book.
When installing a panel in s detached garage is a emergency disconnect required on the exterior or is it ok to put a main lug panel at the point of entry?
If the emergency disconnect is required outside can a main lug panel be installed inside. Also in this case where would the ground rods go to, the emergency disconnect or the panel?
Thank you