Will the underground main emergency conduit from outdoor emergency generator to
building ATS (located inside bldg.) need to be installed in rigid metal conduit ?
If can run with schedule-40 PVC conduits, are the conduits need to be concrete encased ?
building ATS (located inside bldg.) need to be installed in rigid metal conduit ?
If can run with schedule-40 PVC conduits, are the conduits need to be concrete encased ?