The client wants to add a diesel generator (24 hours running capacity) and ATS as secondary backup power source for the entire campus (in case normal utility power outage) in an existing university. The egress lighting in campus already have emergency batteries. Will this new generator automatically be considered emergency generator per NEC 700 and have to comply with all rules in that article or optional standby system (NEC 702)?