Need to ask the pros about this. Doing an estimate for an assisted living complex. I was asked by the General Contractor not include the building generator because theres not going to be any. I agreed but replied that alot of emergancy and exit lights would need to be added so that batteries would light the way of exit. After hanging-up I started to think the generator would still be needed for emergencies, such as : the E-call or Nurse call system , people that could very well be dependant upon a life safety machine. Can someone shed some light on this or at least point me in the right direction to get this resolved such as State Codes, JACHO, OSHA, or equiv. Our estimate is due pretty quick here but my intentions are not to include it and referance "NOT Responsible ect.ect."
Thanks guys, want to be able to back-up my thoughts with a referance.
Mike
Thanks guys, want to be able to back-up my thoughts with a referance.
Mike