I am estimating a commercial job, an office building with some medical labs . No patiant facilities.
We are installing a new emergency lighting distribution panel (ELDP) to an existing generator. We are then refeeding the existing lighting panels .
Does this fall as a emegency system requiring MI cable or does it fall under optional stand by equipment utilizing standard conduit and conductors?
Artical 700.10 mass ademdums ??????
We are installing a new emergency lighting distribution panel (ELDP) to an existing generator. We are then refeeding the existing lighting panels .
Does this fall as a emegency system requiring MI cable or does it fall under optional stand by equipment utilizing standard conduit and conductors?
Artical 700.10 mass ademdums ??????
Last edited: