I have a situation where I need to compare two scenarios to find out the most economical design to choose from; If I chooses to back up the whole building, would I still need to use another ATS for life safety even though I'm using a switchboard construction for the service (2000A, 480/277V) or I only need one? The second scenario is to backup part of the building with some selected loads, which will make me to have two separate emergency system (life safety and stand-by).
Thanks for your thoughts in advance