I'm looking at a drawing for a new laboratory at college. It appears that there is panelboard located about six feet from an emergency shower (The shower doesn't appear to have a floor drain either). I'm not saying that this wrong, but I don't know if this correct either. I don't think I have seen clearances from emergency showers addressed in the NEC. Does anyone have any experience with installations like this?