I was looking at a job recently and the EMT is being used as the ground path for feeders. Where the EMT comes into the connector the electrician had barely gotten the conduit past the set screw, leaving the conduit maybe halfway into the fitting. I said no way, it needs to seat all the way in the fitting. His argument "its good enough". I am certain that the conduit at a minimum should be 80% into the fitting, to assure a solid connection. Any input on this ?