yankeeman411
Member
- Location
- nj
A little unclear on something, im sure its been covered in the past in this forum but having a hard time relating it to to situation, maybe you guys can chime in and clear it up.
i have a panel in an electric room, a one inch pipe goes underground to a rigid 90 then to pvc. Once it hits the destination it goes through the pour in rigid and up the wall in rigid to a jbox that is grounded with a lug. Out of that box with emt and hits a fs box with a pendant light on it and it continues downstream to anout 6 or 7 fs box pendant lights. No gronding bushings anywhere and the jbox was drilled out, no concentric knockouts. Do i need to pull a ground or is the emt enough?
i have a panel in an electric room, a one inch pipe goes underground to a rigid 90 then to pvc. Once it hits the destination it goes through the pour in rigid and up the wall in rigid to a jbox that is grounded with a lug. Out of that box with emt and hits a fs box with a pendant light on it and it continues downstream to anout 6 or 7 fs box pendant lights. No gronding bushings anywhere and the jbox was drilled out, no concentric knockouts. Do i need to pull a ground or is the emt enough?