I was preparing to bury the wire from the well cap to the pump controller and was planning to use EMT from the cap to depth. I figured PVC wasn't suitable for exposure to direct sun (and it's strong in New Mexico). One of my buddies who has worked in the same county told be he tried the same thing and the inspector made him replace the EMT with PVC. Am I missing something, or is the inspector out of whack?