dang
Member
- Location
- Portland, OR, USA
Hello all. Our company is embarking on the expensive road that is UL508A listing, and I'm the lucky guy who gets to head up the project. Hooray for me...or not. I did the UL class on 508A, which wasn't terribly helpful as almost everyone in the class wsa already familiar with 508A, so it was more of a fast paced review than a full walkthrough...
So here's the first of many dumb questions I'll have. Let's say I have a Type 4x/12 enclosure. I pop holes in it, put conduit fittings in (listed and not listed), put a homemade fitting in the bottom, a louver plate in the side, and an HMI (no type rating) on the front. The louver plate meets the rules in 508A. All the other holes I've made in the box are completely covered and sealed by the components I've stuffed in there, so there's no ability to get to live parts from the outside.
Do I just put a line through the type sticker on the box, and treat it as a Type 1 enclosure at that point?
Thanks all.
Dan G
So here's the first of many dumb questions I'll have. Let's say I have a Type 4x/12 enclosure. I pop holes in it, put conduit fittings in (listed and not listed), put a homemade fitting in the bottom, a louver plate in the side, and an HMI (no type rating) on the front. The louver plate meets the rules in 508A. All the other holes I've made in the box are completely covered and sealed by the components I've stuffed in there, so there's no ability to get to live parts from the outside.
Do I just put a line through the type sticker on the box, and treat it as a Type 1 enclosure at that point?
Thanks all.
Dan G