Situation: Separate electrical equipment building with service,MCC, VFD's, etc. Design engineer shows a Ufer ground and a perimiter ground ring with the GEC connected to the service disconnect. They also show a connection from each VFD enclosure to the ground ring. Obviously this is a code violation but looking for the code references.