My company has been pre-wiring ENT offsite. We then install the prewired ENT between the installed ,(nailed down to deck), plastic Kwik-kon j-boxes after the rebar is installed. When we called for a inspection, the inspector said that ithe installation is in violation of the NEC 362. Prewired ENT without the UL listing. I called Carlon and they dont have a UL for prewired ENT, is this right? Article 362.100 allows prewired ent as a manufactured assy. Would this apply? Do I need a UL approval to prewire the ENT before its connected into the box?