tackmaster1978
Member
Im working on a 8 story building the first floor is all commercial T.I and live work units. There are no hard lids so we ran everything in the slab w/ ent and plan on running Ent through the steel framing. Has anybody ran ENT like this. It looks odd and seems like if anything we should be converting to flex. I know the code says its ok with a sprinkler system but has anybody actualy done it.