Hello Everyone,
I need to provide an EPO switch located by the door to shutdown the power to the IRC units and a panelboard serving IT equipment (via shunt trip MCB). The IRC are provided with a remote shutdown terminal and is rated at 75VA -24VAC. My question is, how I can use one EPO switch to kill the panelboard and IRC's? The shunt-trip breaker will accept 120V and the IRC's will accept 24VAC. Do I need to provide a step down transformer (120V-24VAC) to shutdown the power to the IRC's?
Thanks,
I need to provide an EPO switch located by the door to shutdown the power to the IRC units and a panelboard serving IT equipment (via shunt trip MCB). The IRC are provided with a remote shutdown terminal and is rated at 75VA -24VAC. My question is, how I can use one EPO switch to kill the panelboard and IRC's? The shunt-trip breaker will accept 120V and the IRC's will accept 24VAC. Do I need to provide a step down transformer (120V-24VAC) to shutdown the power to the IRC's?