Is it permitted to install and emergency panel and transfer switch in a sprinkled two hour rated electrical room housing the service. The service is 208Y/120 and rated 1600amp. (not healthcare). The generator is outdoors. 7.2.2 seems to indicate it is permitted. Comments?