I have to install a 600amp-6 ganged meter enclosure with bypass and 100amp breakers on a commercial building. I intend to use parallel 350 kcmil cu service conductors and a 2/0 equipment bonding conductor. The problem I have is where to bond the service? The well feed main water line is plastic and pecks tubing is feed throughout the building. Also the building is a stick built, all wood structure. Any suggestions would be helpful.
Thanks,
Thanks,