I have a generator feeding a MDP (and then onto multiple xfr switches).If the gen set is a SDS, can the GEC be made at the MDP instead of at the Gen set? Thereby sizing the equipment bonding jumper (to the MDP) per the requirments of 250.30(A)2.(derived phase conductors).
Rick
Rick