Equipment Grounding Conductor to Equipment Bonding Conductor

Status
Not open for further replies.

tom baker

First Chief Moderator & NEC Expert
Staff member
Location
Bremerton, Washington
Occupation
Master Electrician
A set of proposals to change EGC to EBC. Don G made the same proposals in 2005 cycle, some panels liked, but said lets see what CMP 5 says. Same this time.
Anyone (Hello Don) know what CMP-5 said?

I am reading thru the proposals during lunch. Haven't gotten to Art 250 yet
 
Tom,
I haven't looked at that yet. When I made my proposals there was a majority of CMP 5 in favor, but was one vote short of the required 2/3s majority. Had CMP 5 accepted, the other panels would have been directed by the TCC to accept the change.
 
Basically they said the problem was solved to their satisfaction, and changing the wording further would not overcome what they call "a problem of education" as opposed to verbiage.
 
Basically they said the problem was solved to their satisfaction, and changing the wording further would not overcome what they call "a problem of education" as opposed to verbiage.
Unless the source is a "giant in the industry" CMP5 has a very definite Not Invented Here attitiude. Several other CMPs do too.
 