Ryan@TeamElect
Member
I have a slight promblems with this new system my state code officials are starting to use. That is of course Equipotential Bonding Grid around a hot tub on concrete, pation blocks or stone! Among our electrical staff and calling inspectors i cannot recieve an answer about existing slabs or blocks. they are tlling us to utilize rubber mats. Is there another way to go about existing slabs or blocks? If not where can i get these mats?
Thanks
Ryan
:-?
Thanks
Ryan
:-?