mint402
Member
- Location
- Portland, OR
I tried searching....thought I’d seen before but no luck....
packaged hot tub will be ground level on concrete or pavers. 680.42 (B) says don’t need perimeter bonding if 28” from rim to surface for 30” horiz....
this would apply except existing wood deck might be along one side of unit. Does that mean that surface needs the bonding, and if so how do we run the bond with the wood(attach to underside of wood decking.....seems not very effective)?
thanks, bruce
packaged hot tub will be ground level on concrete or pavers. 680.42 (B) says don’t need perimeter bonding if 28” from rim to surface for 30” horiz....
this would apply except existing wood deck might be along one side of unit. Does that mean that surface needs the bonding, and if so how do we run the bond with the wood(attach to underside of wood decking.....seems not very effective)?
thanks, bruce