It's pool season in the North East this is the first code cycle with this new text.
Has any inspectors seen this yet. In the North East when a pool is installed the contractor installs the paved walking surface after one year from date of the pool installation, I think that the Inspector of Wires would have to wait till that connection is made before closing out the permit?
The equipotential common bonding grid shall extend under paved walking surfaces for 1 m (3 ft) horizontally beyond the inside walls of the pool and shall be permitted to be any of the following.
Has any inspectors seen this yet. In the North East when a pool is installed the contractor installs the paved walking surface after one year from date of the pool installation, I think that the Inspector of Wires would have to wait till that connection is made before closing out the permit?
The equipotential common bonding grid shall extend under paved walking surfaces for 1 m (3 ft) horizontally beyond the inside walls of the pool and shall be permitted to be any of the following.