Joe Voltage
Member
- Location
- San Diego, CA, USA
Hello All,
I am a Security and low voltage tech. Usually the Electrician on the job runs the conduit before we even have the job. Lately, with rising costs, we are being asked to supply our own conduit. Most of the time it is simple, surface mounted conduit to protect the wiring in a parking garage or a shell building. Maybe a couple of 90's or offsets, 1/2" - 2". I was looking for a "rule of thumb" or "basic" way of estimating these jobs. Maybe something like "price per foot" for materials and labor. Any advice for setting this up would be appreciated. Thank You, Joe
I am a Security and low voltage tech. Usually the Electrician on the job runs the conduit before we even have the job. Lately, with rising costs, we are being asked to supply our own conduit. Most of the time it is simple, surface mounted conduit to protect the wiring in a parking garage or a shell building. Maybe a couple of 90's or offsets, 1/2" - 2". I was looking for a "rule of thumb" or "basic" way of estimating these jobs. Maybe something like "price per foot" for materials and labor. Any advice for setting this up would be appreciated. Thank You, Joe