Stevenfyeager
Senior Member
- Location
- United States, Indiana
- Occupation
- electrical contractor
Customer has an existing barn fed with 3 wires underground 160' I realize we run 4 wires now. If I replace the subpanel (its a mess), am I required to run 4 wires ?
25 years ago or more, ALL of us electricians in this area used to run 3 wire URD to all detached buildings and drive a ground rod. All inspectors passed these.
25 years ago or more, ALL of us electricians in this area used to run 3 wire URD to all detached buildings and drive a ground rod. All inspectors passed these.