Customer has exisiting fuel station where a recent dispenser upgrade was performed. The fuel dispenser company didnt perform an onsite survey and ran into a problem installing new dispensers. The swap wasnt a like for like. The old dispensers conduit sat up alot higher than new dispensers causing new dispensers not to fit. The seal offs sat to high causing 1st electrician to remove seal off and install LBY 1st then seal off in order to set dispenser. By removing seal off and installing LBY this allowed conduit to be rerouted inside dispenser This was pretty much done to all dispensers involved.
My question are.
1. Would you as EC have done this as time and materials not knowing the conditions.
2. What solution, besides cutting/threading conduit to lower conduit and fit under dispenser would you have taken?
My question are.
1. Would you as EC have done this as time and materials not knowing the conditions.
2. What solution, besides cutting/threading conduit to lower conduit and fit under dispenser would you have taken?