Hello All,
My Project manager and I are putting together a change order to relocate an existing feeder conduit which is labeled on the plans as existing to remain. The issue is this 2" feeder is running right through where a shower will be installed. It is currently running along the roof inside the building, and also has a junction box above where the shower will be.
While it is high up, we think having the feeder go through the shower is not going to fly. I can't find the exact code to back this up, but I imagine you guys might have some idea of what code we can include along with our change request to back us up. We want to make sure we are able to relocate this feeder out of the bathroom area.
My Project manager and I are putting together a change order to relocate an existing feeder conduit which is labeled on the plans as existing to remain. The issue is this 2" feeder is running right through where a shower will be installed. It is currently running along the roof inside the building, and also has a junction box above where the shower will be.
While it is high up, we think having the feeder go through the shower is not going to fly. I can't find the exact code to back this up, but I imagine you guys might have some idea of what code we can include along with our change request to back us up. We want to make sure we are able to relocate this feeder out of the bathroom area.