Situation!
Have existing service condcutors coming in from utility to a "service end box" that feeds an existing service switchboard.
They are builing a new additon to the building and want us to TAP the existing serive conductors to feed a new MDP board.
Some concerns.
1. I'd assume this tap can't be done live even though it's 120/208v?
2. If the utility was to shutdown power then the existing building would loose power. Now we have a temping out of the existinf service? Oh geez
3. Who knows what we're tapping in the "service end box" could be lugs, bus detail, existing splices? Not sure
Thank you.
Have existing service condcutors coming in from utility to a "service end box" that feeds an existing service switchboard.
They are builing a new additon to the building and want us to TAP the existing serive conductors to feed a new MDP board.
Some concerns.
1. I'd assume this tap can't be done live even though it's 120/208v?
2. If the utility was to shutdown power then the existing building would loose power. Now we have a temping out of the existinf service? Oh geez
3. Who knows what we're tapping in the "service end box" could be lugs, bus detail, existing splices? Not sure
Thank you.