wrobotronic
Senior Member
- Location
- Colorado
Hi all,
is there a section in the code that will allow an existing copper water line to run above a new panel installation. I spoke with the electrician today and we determined that the ball valve that is there would be better off moved, but as the AHJ, I merely suggested it as I don't know that it is required to move it per the NEC. You can see the wood backer is where the new panel will go. As always thank you for your time.
is there a section in the code that will allow an existing copper water line to run above a new panel installation. I spoke with the electrician today and we determined that the ball valve that is there would be better off moved, but as the AHJ, I merely suggested it as I don't know that it is required to move it per the NEC. You can see the wood backer is where the new panel will go. As always thank you for your time.