gadfly56
Senior Member
- Location
- New Jersey
- Occupation
- Professional Engineer, Fire & Life Safety
I'm working on a project that has three distinct structures. Two buildings joined by an elevated pedestrian bridge. During the earlier construction phases the bridge will be anchored at one of the buildings but after the complex is commissioned there will be motion between all three structures. The expected range of motion is +/-5" between any pair of structures in both the axial and lateral direction. No vertical motion is anticipated. These requirements come out of a seismic analysis. The project is NOT in California. I'm looking for some suggestions on how to handle this situation with regard to fire alarm wiring. The wiring is required to be run in conduit.