Have a hoist that's running 8 floors. They want me to pull power from inside, pop out on 1st floor and run it up the building( against wall) splicing and teeing off at each floor to feed (2) lights for the hoist landing.
Could I run romex outside or should I use another wiring method because it may be exposed to the elements to a degree?
Could I run romex outside or should I use another wiring method because it may be exposed to the elements to a degree?