Curious, how long, about, does it take to trace out a circuit breaker(circuit)? Talking commercial space about 10,000 sq. ft.
Probably not as long for a feeder. Branch circuits depend on underground, overhead, in-wall, accessible above ceilings, completeness of existing panel schedules, need for exact circuit breaker within a panel (opening equipment), if all devices need to be traced or just homerun, etc.
For lack of more information: 20 minutes to 3 days.
lol..ok
Curious, how long, about, does it take to trace out a circuit breaker(circuit)? Talking commercial space about 10,000 sq. ft.