Greetings all
Do any of work on or design facilities that dont mix say 480/277 & 208/120 or 480 and 240/120 or 600/347 systems in the same raceways?
And require all the 480-600V raceways to be identified?
The NEC allows it. Is there a 70E reason some places are not doing it anymore?
Thanks in advance
and happy new year
Do any of work on or design facilities that dont mix say 480/277 & 208/120 or 480 and 240/120 or 600/347 systems in the same raceways?
And require all the 480-600V raceways to be identified?
The NEC allows it. Is there a 70E reason some places are not doing it anymore?
Thanks in advance
and happy new year