Isaiah
Senior Member
- Location
- Baton Rouge
- Occupation
- Electrical Inspector
I’m concerned with this design from the engineering firm. There’s no CB or Fused switch on two of the feeders. The upstream CB at the SWGR protects both. The cables are all the same size, but it just doesn’t look right. Shouldn’t there be additional OCPDs on the two?
Sent from my iPhone using Tapatalk