We have 2 200 amp Square D panels right next to each other and one guy terminated 2 3/0 hot wires under a single lug and jumped to the other panel. I told him we needed a feed through panel but he said the lugs were feed through lugs. It was only under one screw and I thought it had to be a double barrel lug with seperate screws. Having a hard time trying to find it in the code book whether this is allowed or not