Have a customer who is set up for 208v 400a service panel. Having service calls being placed for the AC units shutting off. Getting varying low voltage to the units 191/193/190 on average. Called COMED and was told the wiring and the xformer were bad then now good. Pics show the feed from the pole xformer to the building going from a 3 wire splice to wires paired up making 6 about 300' to the building and back to 3 for the last 100'. Pissed customer and Comed no help. Any thoughts?