Pat Capouch
Member
I would like to know whether there is any code or electrical engineering criteria to determine when feeder cable lacing is required or recommended in switchgear. Its my understanding this used to prevent or minimize cable motion during a fault condition. Are there guidelines or restrictions of cable distance from end of raceway to conductor termination point in the switchgear?
Thanks
Thanks