What determines whether a feeder EGC in EMT requires bonding bushings?
My situation:
Existing:
240/120v 4-wire high-leg service
Outside fused-switch disconnect
Plan new:
Four x 250 MCM, one x #4 EGC
Inside panel, no concentric KOs
Plans call for the EGC conductor
I'm recommending eliminating the EGC, but customer is hoping to avoid plan changes. So, I need to know whether I should include labor and materials for installing bonding bushings in my comparison for my response.
My situation:
Existing:
240/120v 4-wire high-leg service
Outside fused-switch disconnect
Plan new:
Four x 250 MCM, one x #4 EGC
Inside panel, no concentric KOs
Plans call for the EGC conductor
I'm recommending eliminating the EGC, but customer is hoping to avoid plan changes. So, I need to know whether I should include labor and materials for installing bonding bushings in my comparison for my response.