Inspector13
Member
- Location
- W.Va.
Evening all,
As an electrical inspector I'm not ashamed to say I don't know all the answers. Well, my sometimers has kicked in today and I can't find chapter and verse to turn down a request I had today. The electrician plans to install a 15 or 17 kw standby generator with automatic switch gear on an existing 100 amp OH service. As currently installed the wiring between the meter and panel goes through a hole in the back of the meter. He wants to go out of the meter to the automatic switch gear, then, he wants to feed back through the meter box and through the hole in the back of the meter box and into the panel.
Are you with me so far? To me what he wants to do is wrong so far as feeding back through the meter box but I can't find the code sections I need to back me up. Any help would be very much appreciated. He wants to do this day after tomorrow so I'm in a time crunch on this one for an answer.
Thanks,
Keith
As an electrical inspector I'm not ashamed to say I don't know all the answers. Well, my sometimers has kicked in today and I can't find chapter and verse to turn down a request I had today. The electrician plans to install a 15 or 17 kw standby generator with automatic switch gear on an existing 100 amp OH service. As currently installed the wiring between the meter and panel goes through a hole in the back of the meter. He wants to go out of the meter to the automatic switch gear, then, he wants to feed back through the meter box and through the hole in the back of the meter box and into the panel.
Are you with me so far? To me what he wants to do is wrong so far as feeding back through the meter box but I can't find the code sections I need to back me up. Any help would be very much appreciated. He wants to do this day after tomorrow so I'm in a time crunch on this one for an answer.
Thanks,
Keith