JSugarKane
Member
- Location
- Jobstown, NJ, USA
Hey all,
I'm somewhat new here so forgive any ignorance I may have. My company is looking to bid a job that requires building cabinets and countertops for a mall eat in area. It will be in roughly a 15'x15' square. All utilities are coming up from the floor. One of the subcontractors has placed a load center fairly far back in the cabinet, approximately 12-14 away from the spot where the utilities emerge from the floor. I'm looking for anything code wise that speaks to whether or not they can run the feeder line through the cabinetry that long and if a disconnect would be needed or not. Any help or direction would be appreciated. thanks!
Josh
I'm somewhat new here so forgive any ignorance I may have. My company is looking to bid a job that requires building cabinets and countertops for a mall eat in area. It will be in roughly a 15'x15' square. All utilities are coming up from the floor. One of the subcontractors has placed a load center fairly far back in the cabinet, approximately 12-14 away from the spot where the utilities emerge from the floor. I'm looking for anything code wise that speaks to whether or not they can run the feeder line through the cabinetry that long and if a disconnect would be needed or not. Any help or direction would be appreciated. thanks!
Josh