I am involved in a marina design. The proposed electrical feeders and conduits will be installed in the cast-in-place concrete deck. These conduits will be passing through the proposed fuel dispensing area of the marina. Can these conduits be PVC with the last two feet in RMC with seal offs or do they need to be RMC all the way.
Edwin
Edwin
