A contractor has fed chain mount flourescents by mounting the EMT to the fixture itself. The conduit runs from light to light along the top of the fixture, with a 4 sq.box on top of each fixture. This has to be a violation, but I am having trouble finding the article. Any thoughts? Thanks.