I have panels in the basement of 3 condos. They are only 6 cir cans. I bought main lug cans and added a mian breaker. I have a hot water heater in basement for each unit, condenser out side for each unit and I have to feed a sub panel in each unit.
What I did was took the load side of the meter and fed it to a 100 amp breaker in the 6 cir can. Then put a single 20 and a 2 pole 30 in. Is there an issue with me cutting the sub panel into the main lugs?
I really dont see why there would be.
I have gotten quite a few comments from other electricains who have seen this. One told me to feed the panel from the main lugs and put the sub panel off the 100 amp breaker. ?????????
I really dont see an issue. I am going for a final next week. Although makeing mistakes is how we learn...... it doesn't look good infront of a contractor.
Any thoughts..............
What I did was took the load side of the meter and fed it to a 100 amp breaker in the 6 cir can. Then put a single 20 and a 2 pole 30 in. Is there an issue with me cutting the sub panel into the main lugs?
I really dont see why there would be.
I have gotten quite a few comments from other electricains who have seen this. One told me to feed the panel from the main lugs and put the sub panel off the 100 amp breaker. ?????????
I really dont see an issue. I am going for a final next week. Although makeing mistakes is how we learn...... it doesn't look good infront of a contractor.
Any thoughts..............