For the metal fence around a PV site, what section of NEC covers the size of the of the conductor that should be used to bond the fence to the metal frame of the PV racks?
I understand the difference between GEC and EGC, and I want to say this should follow table 250.122 (EGC), but Part VII of 250 which covers DC doesn't comment much on this and really only mentions GEC in 250.166(B).
I'll take NEC interpretations or what you have seen AHJ's think on this.