capsol
Member
- Location
- Portland, Oregon
- Occupation
- Feild Supervisor
Morning all,
I know fence grounding has been addressed here multiple times but I'm not finding the info I need. My question pertains to mainly solar sites. I know 250.194 addresses fence grounding. Sub station fence grounding makes sense. In regards to fence grounding Am I assuming correctly when switch gear is set within the site fence grounding is "preferred" but not required? Also over head power lines that cross the fence perimeter I would assume would require the fence to be grounded?? Any help finding previous post regarding this or further code articles would be great! Thanks in advance!
I know fence grounding has been addressed here multiple times but I'm not finding the info I need. My question pertains to mainly solar sites. I know 250.194 addresses fence grounding. Sub station fence grounding makes sense. In regards to fence grounding Am I assuming correctly when switch gear is set within the site fence grounding is "preferred" but not required? Also over head power lines that cross the fence perimeter I would assume would require the fence to be grounded?? Any help finding previous post regarding this or further code articles would be great! Thanks in advance!