I have currently taken over a job that has had underground already done. After viewing the cut sheet on the switchgear I see that the fire pump feed needs to be in the next section over. They tell me that the concrete is 5' thick where they are turned up. My question is there any acceptable way of getting this raceway into next section, RIG elbow etc.
 